               INTRODUCTION  | 
              
              
                | 
                 | 
              
              
                | 
                 Central Design Directorate was 
                established at Lucknow in the year 1961 for the specific need of 
                undertaking the designs of major hydro projects. To facilitate 
                the works of Tehri Dam Project a Design Circle was transferred 
                from Lucknow to Roorkee in the year 1971. To cater the need of 
                new multipurpose projects which were coming up for execution, 
                particularly in the Yamuna and Ganga Valley located in the 
                central Himalayan region, presently in Uttranchal, were also 
                assigned to this circle resulting in the creation of Irrigation 
                Design Organisation by expanding the only one Circle to ten 
                Circles under two Chief Engineers in the year 1978 at Roorkee.
                 
                The Irrigation Design Organisation 
                has been serving the state for the last three decades by 
                undertaking the planning and preparation of efficient and 
                econimical detailed designs and construction drawings of various 
                multipurpose, hydroelectric and Irrigation projects with the 
                help of well established infrastructure based on modern 
                techniques.  | 
              
              
                | 
                 | 
              
              
                | 
            
            
           Top...  | 
              
              
                | 
                 CONSULTANCY AREAS  | 
              
              
                | 
                 | 
              
              
                | 
                 Having served the country very well for three decades, 
                this organisation has a well established base in the design of :- 
                
                  
                    
                      | 
                    Concrete Gravity Dams | 
                   
                  
                    
                      | 
                    Earth and Rockfill Dams | 
                   
                  
                    
                      | 
                    Roller Compacted Concrete Dams | 
                   
                  
                    
                      | 
                    Surface and Underground Power House
                     | 
                   
                  
                    
                      | 
                    Surge Tanks / Tunnels 
                     | 
                   
                  
                    
                      | 
                    Penstocks / Pressure Shafts
                     | 
                   
                  
                    
                      | 
                    Intakes and Sedimentation Chambers
                     | 
                   
                  
                    
                      | 
                    Various Types of Hydraulic Gates | 
                   
                  
                    
                      | 
                    Prestressed Concrete Bridge and Aqueducts
                     | 
                   
                  
                    
                      | 
                    Barrages, Gates & Hoists | 
                   
                  
                    
                      | 
                    Cross-Drainage Works
                     | 
                   
                  
                    
                      | 
                    Canal Works | 
                   
                   
                 | 
              
              
                | 
            
            
           Top...  | 
              
              
                | 
                 MAIN DESIGNS CARRIED OUT  | 
              
              
                | 
                 | 
              
              
                | 
                 A few important projects are :-  
                
                 | 
              
              
                | 
            
            
           Top...  | 
              
              
                | 
                 SOME IMPORTANT HYDROLOGICAL STUDIES  | 
              
              
                | 
                 | 
              
              
                | 
                 The hydrological computations regarding estimation of probable maximum flood and 
                water availability studies related to the following hydroelectric schemes were taken up. 
                
                  
                    
                      | 
                    Tehri Dam project
                     | 
                   
                  
                    
                      | 
                    Bawla Nand Prayag Hydroelectric Project
                     | 
                   
                  
                    
                      | 
                    Tapovan-Vishnugad Hydroelectric Project
                     | 
                   
                  
                    
                      | 
                    Srinagar Hydroelectric Project
                     | 
                   
                  
                    
                      | 
                    Lakhwar Vyasi Project
                     | 
                   
                  
                    
                      | 
                    Jamrani Dam Project
                     | 
                   
                  
                    
                      | 
                    Vishnu Prayag Hydel Scheme
                     | 
                   
                  
                    
                      | 
                    Karan Prayag Hydel Scheme
                     | 
                   
                  
                    
                      | 
                    Madhya Ganga Canal Stage-II
                     | 
                   
                  
                    
                      | 
                    Barkot-Kuwa Hydel Scheme
                     | 
                   
                  
                    
                      | 
                    Hanuman Chatti Sianchatti Hydel Scheme | 
                   
                   
                 | 
              
              
                | 
            
            
           Top...  | 
              
              
                | 
                 COMPUTERISED DRAUGHTING FACILITY  | 
              
              
                | 
                 | 
              
              
                | 
                 A CAD Work 
                Station was established at the organisation in the year 1990 
                with the basic purpose of developing computer draughting 
                facility. The Centre is the first of its kind in the combined 
                U.P. and uttarakhand Irrigation Department to start preparing 
                computerised technical drawings. More than 300 drawings have 
                been prepared with the computers.  | 
              
              
                | 
            
            
           Top...  | 
              
              
                | 
                 CONTACT  | 
              
              
                | 
                 | 
              
              
                | 
                Chief Engineer & Director Irrigation Design Organisation 
                Roorkee-247667 
                Tel: 01332-265174 
                Fax: 01332-262487 
                E-mail: ce@iriroorkee.com 