Completed Projects

 

1. Dr. Sushanta Dutta

2. Dr. A K Das

3. Dr. K M Singh

4. Dr. Sudhakar Subuddhi

5. Dr. Manish Mishra

 6. Dr. Ankit Bansal

7. Dr. Andallib Tariq

8. Dr. P M Pathak

9. Dr. Indra Vir Singh

10. Dr. P K Jha

11. Dr. R S Mulik

12. Dr. B K Gandhi

 

 

13. Prof. Satish C. Sharma

S. No.

Project Title

Sponsoring Agency

Duration

Financial Outlay (In Rs.)

Name Of P.I. And Other Investigators

Project No.

1

 Fault Diagnosis And Prognosis Of High Speed Rolling Element Bearing

Dst, Govt. Of India

     3

Years

(2009-2012)

 31.848 Lacs

Satish C. Sharma(Co P I)

Suraj P. Harsha (P I)

Pradeep Kumar (Co P I)

Dst-457-Mid

2

 Prediction And Optimization Of Distortion And Residual Stresses In Austentic Stainless Steel Pipe Welds

Deptt. Of Automic Energy, Brns, Goi

     3

Years

(2011-2014)

24.3195 Lacs

Satish C. Sharma (Co P I)

Manas M. Mahpatrra (P I)

Pradeep Kumar (Co P I)

Brns-579-Mid

3

A Parametric Study Of Performance Of A Coriolis Mass Flow Rate Meter

Dst

     3

Years

(2006-2009)

19.87 Lacs.

 

Satish C. Sharma ( P I)

Ravi Kumar (P I)

Dst-262-Mid

4

Experimental Investigation Of Hydrodynamic Journal Bearing System For Improved Stability

Aicte (Under Modrobs Scheme)

        3

Years

(1995-1998)

5.00 Lacs

Satish C. Sharma ( P I)

S C Jain (Co P I)

Aicte-5746-03-Mid

 

      Consultancy Research/Projects:

S. No.

Project Title

Sponsoring Agency

Duration

Financial Outlay (In Rs.)

Name Of P.I. And Other Investigators

Project No.

1

Ropeway Inspection At Mussoorie

Shail Shikher Associates Mussoorie

1 Month

50934

Satish C. Sharma (Co P I)

Pradeep Kumar (P I)

Mid-1005/09-10

 

2

Evaluation Of Rope Performance

Garhwal Mandal Vikas Nigam Ltd., Dehradun

18 Days

90000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-2007/09-10

 

3

Inspection Of Ropeway At Mussoorie

M/S Shail Shikher Associates ( Regd. ) Mussoorie

20 Days

50000

Satish C. Sharma (Co P I)

Pradeep Kumar (P I)

Suraj P. Harsha (Co P I)

Mid-1008/09-10

 

4

Study And Design Improvement In Ctrb Of Freight Stock Of Indian Railways

Rdso, Lucknow

2 Years

4

Months

2138713

Satish C. Sharma(P I)

Suraj P. Harsha(Co P I)

Mid-1007/09-10

 

5

Technical Enquiry Of Mansadevi Ropeways

District Magistrate Haridwar

35 Days

200000

Satish C. Sharma( P I)

V. K. Goel (Co P I)

R.P. Gakkhar (Co P I)

Mid-1011/09-10

 

6

Inspection Of Ropeway At Mansa Davi, Hardwar

District Magistrate Haridwar

8 Days

60000

Satish C. Sharma( P I)

V. K. Goel (Co P I)

R.P. Gakkhar (Co P I)

Mid-1003/10-11

 

7

Inspection Of Kempty Fall Ropeway At Mussorie

M/S Neena Contractors And Builders Pvt. Ltd., Dehradun

11 Days

91000

Satish C. Sharma (Co P I)

Pradeep Kumar (P I)

Suraj P. Harsha (Co P I)

Mid-1004/10-11

 

8

Site Visit And Discussion At Ongc

Ongc Ltd. Vadodra

3 Months

15000

Satish C. Sharma (P I)

M. Mahapatra (Co P I)

Suraj P. Harsha (Co P I)

Mid-1005/10-11

 

9

Vetting Of Design For Maa Chandi Devi Ropeway Hanger

M/S Usha Breco Ltd., Regional Office Haridwar

2 Months

180000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1009/10-11

 

10

 

Inspection Of Ropeway At Mussorie

M/S Shail Shikhar Associates, Mussorie

10 Days

78975

Satish C. Sharma( P I)

Pradeep Kumar (Co P I)

Mid-1011/10-11

 

11

Vibration Analysis Of Two Components Of Eicher Tractors

Eicher Tractors Ltd. Bhopal

3.5 Months

400000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-1012/10-11

 

12

Inspection Of Ropeway System At Kempty Fall, Mussorie

M/S Neena Contractors & Builders Pvt. Ltd. Dehradun

1.5 Months

101360

Satish C. Sharma (Co P I)

Pradeep Kumar (P I)

Suraj P. Harsha (Co P I)

Mid-1021/10-11,

 

13

Inspection Of Ropeway System At Gun Hill Point Mussorie

M/S Shail Shikhar Associates, Mussorie

25 Days

101360

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1022/10-11

 

14

Root Causes Analysis Of Shaft Failure Of Ropeway

Ex. Officer Office Of Nagar Palika Parishad Mussoorie

10 Days

101360

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1004/11-12

 

15

Inspection Of Over All Operation Of Rope Way

M/S Shail Shikhar Associates Ropeway Mussoorie, Distt. Dehradun Uttarakhand

15 Days

71000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1010/11-12

 

16

Inspection Of Ropeway System At Gun Hill Point, Mussoorie

M/S Shail Shikhar Associates Ropeway, Mussoorie

1 Months

101015

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-1001/12-13

 

17

Inspection Of Ropeway System At Gun Hill Point, Mussoorie

M/S Shail Shikher Associates , Ropeway Jhulaghar Mussoorie

25 Days

111250

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6002/12-13

 

18

Computation And Validation Of Lube Oil And Jacking Oil Flows/Losses As Well As Stiffness And Damping Coefficients In Hydrodynamic Journal Bearings Of Steam Turbine

Bhel Hardwar

8 Months

1250000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6021/12-13

 

19

Inspection Of Ropeway System St Gun Hill Point, Mussorie

M/S Shail Shikhar Associates (Regd.), Mussorie

2 Months

109676

 

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6001/13-14

 

20

Inspection Of Ropeway System At Kampty Fall, Mussorie

M/S Neena Contractors & Builders Pvt. Ltd.,Dehradun

45 Days

109676

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6002/13-14

 

21

Design Vetting Of Column Bearing Housing

Isgec, Yamunagar

1 Month 10 Days

300000

Satish C. Sharma( Co P I)

Suraj P. Harsha ( P I)

Mid-6004/13-14

 

22

Inspection Of Ropeway System At Gun Hill, Mussorie

M/S Shail Shikhar Associates (Regd.), Mussorie

1 Month

109676

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6018/13-14

 

23

Development Of A Software For The Design Of Multi Plate Wet Clutch.                                                                  

M/S Makino Auto Industries Pvt. Ltd., Noida

1 Year

300000  

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6024/13-14

 

24

Development Of Upgraded Draft Gear For Freight Stock: Development Of Testing Regimes

Rdso Lucknow

1.5 Years

2125000

 

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6030/13-14

 

25

Design Vetting Of Fixture Of 28 Axle Rail Wagon

Bhel Haridwar

8 Month 15 Days

870000

Satish C. Sharma(Co  P I)

Suraj P. Harsha ( P I)

Pradeep Kumar (Co P I)

Mid-1004/09-10

 

26

Design Of 650 Kn Lifting System

Pioneer Fabrication (P) Ltd., Meerut

25 Days

30734

Satish C. Sharma(Co  P I)

Suraj P. Harsha ( P I)

Pradeep Kumar (Co P I)

Mid-1007/10-11

 

27

Analysis Of 250 Mw Francis Turbine Components For Karcham Wangtoo Hep. (1000 Mw),

M/S Jai Prakash Associates Ltd. Noida

2 Months

480000

Satish C. Sharma(Co  P I)

Suraj P. Harsha ( P I)

Mid-1010/10-11

 

28

Study And Root Cause Analysis Of High Vibration Analysis In Circulating Water Pumps 2x250 Mw Thermal Power Plant, Chabbra ( Rajastan),

M/S Punj Lloyod Ltd. Gurgaon,

22 Days

700000

Satish C. Sharma(Co  P I)

Suraj P. Harsha ( P I)

Mid-1014/10-11

 

 

29

Feasibility Study For Use Of Ptef (Teflon)  Multiball Bearings Support For Condensor.

Bhel, Haridwar

7 Months

 15 Days

850000

Satish C. Sharma(Co  P I)

Suraj P. Harsha ( P I)

Mid-1015/11-12

 

 

30

Design Of Dewatering And Drainage System For Flood Control At Tehri Dams

 

Thdc Ltd. 

1 Year 10 Months

724801

Satish C. Sharma(Co  P I)

Suraj P. Harsha ( P I)

Mid-1015/11-12

 

31

Performance Enhancement Of Multipurpose High Low Pressure- Fire Pump 

 Shri Ganesh Fire Equipments(P) Ltd., New Delhi

9 Months

825000

Satish C. Sharma(Co  P I)

Suraj P. Harsha ( P I)

Mid-6016/13-14

 

 

32

Annual Testing Of Ropeway

M/S Shail Shikhar Associates (Regd.), Mussorie

25 Days

22274

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1011/06-07

 

33

Ropeway Inspection At Dehradun

Shri Ganpati Sagar Hill Rise, Dehradun

12 Days

25000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1003/07-08

 

34

Inspection Of Ropeway

M/S Shail Shikhar Associates (Regd.), Mussorie

22 Days

50000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1001/08-09

 

35

Maintenance Evaluation Of Ropeway

M/S Shail Shikhar Associates (Regd.), Mussorie

15 Days

50000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1004/08-09

 

36

Site  Visit Of Ropeway System At Jhulaghar

M/S Shail Shikhar Associates (Regd.), Mussorie

1 Months

50934

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1001/09-10

 

37

Inspection Of Ropeway System At Kempty Mussorie

M/S Neena Contractors & Builders Pvt. Ltd.,Dehradun

10 Days

101325

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-1003/12-13

 

38

Aircraft Noise Monitoring Around Indira Gandhi International Airport

Central Pollution Control Board, New Delhi

1.5 Years

400000

Satish C. Sharma( Co P I)

S P Nigam (P I)

S C Jain (Co P I)

M Bhattacharya  (Co P I)

Mid-Ii-001/99-2000

39

Planning And Design Of Gravity Ropeway In Nagaland.

National Horticulture Board,Ministry Of Agriculture (Goi)

7 Months

1500000

Satish C. Sharma( Co P I)

R.P. Gakkar (P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (Co P I)

Mid-1015/10-11

 

40

Site Of Ropeway System At Kempty Fall,

Mussoorie

M/S Neena Contractors & Builders Pvt. Ltd.,Dehradun

35 Days

90000

Satish C. Sharma( Co P I)

Suraj P. Harsha (Co P I)

Pradeep Kumar (P I)

Mid-1002/09-10

 

41

Site Visit Discussion At Site And Advice For Quality Assurance For Development Of Bihar State Under Rsvy By Cpwd

Cpwd Patna Bihar

2 Years 15 Days

22961908

Satish C. Sharma( Co P I)

S C Jain  And Others

 

Cts-1001/08-09

 

42

Field And Laboratory Studies For Quality Assurance For Development Of Bihar State Under Rsvy By Cpwd

Cpwd Patna Bihar

2 Years 15 Days

22961908

Satish C. Sharma( Co P I)

S C Jain  And Others

 

Cts-2002/08-09

 

 

43

Third Party Inspection Of 100 Cusec Water Treatment Plant To Supply Water To Greater Noida

Project Manger, Ganga Jal Project Unit, Up Jal Nigam, Pratap Vihar Ghaziabad

3 Years

6230000

Satish C. Sharma( Co P I)

V.K. Goel And Others

 

Ced-1067/10-11

 

 

44

Erosion Analysis Of Guide Vane-Kw Hydro Electic

Jai Prakash Power Ventures Ltd, Noida

5 Months

10 Days

898880

Satish C. Sharma( Co P I)

Suraj P. Harsha (P I)

 

Mid-6003/14-15

45

Devlop Welding Parameters For Outer Ring Of Gbc 250/500/600/800 Mw To Control Distortion

Bhel, Haridwar

6 Months

880000

Satish C. Sharma( Co P I)

Suraj P. Harsha (Co P I)

Dr. M.M Mahpatra(P I)

Mid-6002/14-15

46

A Study On Hydrodynamic Journal Bearings Of Steam Turbine To Compute The Lube Oil And Jacking Oil Flow/Losses By Considering The  Temperature Variation In Oil Film

Bhel, Haridwar

1 Year

2022000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6006/14-15

47

Design And Calculation  Of Aerial Ropeways For Transport Of Materials

 

Uttarakhand Agricultural Produce Marketing Board Dehradun

Niranjanpur

Dehradun- 248001

 

1 Months

25 Days

199500

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6008/15-16

48

Inspection Of Ropeway System At Gun Hill, Mussorie

M/S Shail Shikher Associates , Ropeway Jhulaghar Mussoorie

1 Months

15 Days

135000

Satish C. Sharma( P I)

Suraj P. Harsha (Co P I)

Mid-6012/15-16

49

Mechanical Fault Diagnosis Of Gear Under Various Conditions

Isgec, Yamunagar

2 Months

10 Days

148200

Satish C. Sharma( Co P I)

Suraj P. Harsha (P I)

 

Mid-6011/15-16

50

Ropeway Inspection At Jhulaghar, Mussoorie

M/S Shail Shikhar Associates (Regd.), Mussorie

25 Days

174239

Satish C. Sharma( Co P I)

Suraj P. Harsha (P I)

 

Mid-6001/16-17

51

Vibration Data Analysis Of High Speed Rotary Machine Ans Auxilliaries At Tehri Hpp And Koteshwor Hep

Tehri Hpp And Koteshwor Hep

1 Year

1488500

Satish C. Sharma( Co P I)

Suraj P. Harsha (P I)

 

Mid-6003/16-17