Guidelines for reports preparation: pre-feasibility, feasibility/detailed project report, as built report

 

Title

1.5: Guidelines for reports preparation: pre-feasibility, feasibility/detailed project report, as built report

Scope

  • Introduction
  • Objectives
  • Planning

-      Sources of data

-      Hydrology studies

-      Water Power studies

-      Conceptual design

-      Preliminary cost estimate

-      Preliminary economic assessment

-      Recommendations (on socio-economic impacts and further studies)

  • Pre Feasibility  report

-      Recommendations on structure locations, confirmation of head etc.

-      Access and power evacuation arrangement,

-      Outline program for site investigation program

-      Upgrading of planning (desk) report

-      Conclusions

  • Feasibility Report/Detailed Project Report

-       Location

-       Access

-       Data collection and analysis

-       Investigations

-       Water power studies

-       Installed capacity

-       Equipment selection

-       Layout of schemes

-       Civil works

-       EIA

-       Clearances required

-       Cost aspects

-       Techno-economic analysis

·         As Built Report- reference only

Status

Under Preparation

Committee

1. Shri D.S.Verma, Sr. Executive Engineer, HPSEB, Shimla

2. Shri H.J. Patel, Supdt. Engineer (Civil), Distt. Anand (Gujarat)

3. Sh MK Singhal, SSO, AHEC, IIT Roorkee

4 Sh GR Panwar, SVS Engineering Services, Noida(UP)

Remarks