Title |
1.5: Guidelines for reports preparation: pre-feasibility, feasibility/detailed project report, as built report |
|
Scope |
- Sources of data - Hydrology studies - Water Power studies - Conceptual design - Preliminary cost estimate - Preliminary economic assessment - Recommendations (on socio-economic impacts and further studies)
- Recommendations on structure locations, confirmation of head etc. - Access and power evacuation arrangement, - Outline program for site investigation program - Upgrading of planning (desk) report - Conclusions
- Location - Access - Data collection and analysis - Investigations - Water power studies - Installed capacity - Equipment selection - Layout of schemes - Civil works - EIA - Clearances required - Cost aspects - Techno-economic analysis · As Built Report- reference only |
|
Status |
Under Preparation |
|
Committee |
1. Shri D.S.Verma, Sr. Executive Engineer, HPSEB, Shimla 2. Shri H.J. Patel, Supdt. Engineer (Civil), Distt. Anand (Gujarat) 3. Sh MK Singhal, SSO, AHEC, IIT Roorkee 4 Sh GR Panwar, SVS Engineering Services, Noida(UP) |
|
Remarks |
|